Maybe at the third attempt – this will actually happen this time!
| 17 July — 21 July |
| Delays possible Traffic control (two-way signals) |
| Works location: LAY 2X NEW DOMESTIC SERVICE 12M FROM 125MM PE MAIN INNEARSIDECARRIAGEWAY… |
| Works description: COVERING FLAT 2 AND FLAT 3 WAXWELL LANE PINNER HARROW HA5 3EN… |
| Responsibility for works: Cadent |
| Current status: Planned work about to start |
| Works reference: AZ0071000736606 |