Relocation of Pedestrian Crossings to be Completed!

We have been informed that the works to relocate the pedestrian crossing at the bottom of the High Street and the adjacent pedestrian crossing at the bridge at the bottom of Bridge Street will finally be completed within the next two weeks (hopefully starting on the 24th October).

The long delay in completing these works has been due to the damage that was inflicted to the frontage of “Swags & Tails” when a car ran into the building in the summer of 2015. The damaged building had to be stabilised before it was safe to carry out the required works to complete the relocation of these pedestrian crossings, and it has taken this long for that necessary task to be done.